Yanshan, Cangzhou, Hebei, China Production, inspection and export preparation العربية +86 135 1348 3281 [email protected]
RenlongHebei Renlong Pipe Fittings Co., Ltd.العربية Build an RFQ
Export process

From the Yanshan works to the destination port.

Follow a typical order through specification review, production, inspection, packing and despatch preparation.

This is a typical sequence. Final inspection, packing, documents and routing are confirmed against the actual order.
WorksYanshan, Cangzhou
Port accessHuanghua and North China ports
DeliveryBuyer destination
Large steel flange representing the ordered product scope 01 / Define

The order starts with a readable line.

Product form, size, standard, material grade and quantity stay together. Missing dimensions or inspection requirements are returned before pricing.

  • Item and quantity
  • Standard, pressure class or wall thickness
  • Destination and requested documents
Large-diameter fittings stored and prepared in the Renlong workshop 02 / Make

Production follows the approved scope.

Forming, welding, machining and finishing are organized around the ordered item. The specification, not the product category name, controls the work.

  • End preparation and dimensions
  • Material grade and marking
  • Finishing requested for the order
Carbon steel fittings grouped for inspection at the Renlong workshop 03 / Check

Inspection records what was checked.

Dimensions, marking and requested test documents are checked against the order. EN 10204 3.1 is supplied with the goods when included in the scope.

  • Dimensional and visual checks
  • Chemistry and mechanical results in the material certificate
  • Third-party or project inspection when agreed
Coated and galvanized piping components prepared for export 04 / Pack

Marking and packing keep the lines visible.

Goods are marked and packed for sea freight with the agreed product identification. Packing can follow the destination and project requirements confirmed at quotation.

  • Size, class, grade and heat-number marking
  • Bundled, crated or palletised packing
  • Export marks and packing-list identification
Pipes and fittings prepared in the Renlong workshop 05 / Move

Despatch is prepared as one document set.

The works is in Yanshan, Cangzhou, with access to Huanghua and other North China ports. Final routing and freight terms are confirmed per order.

  • Packing list and commercial invoice
  • Material certificates and agreed reports
  • Certificate of origin where required
Document pack

The paperwork follows the goods.

EN 10204 3.1

Material certificate supplied with the order.

Inspection records

Reports for tests and checks written into the order.

Packing list

Package and line identification for receipt and customs.

Commercial documents

Invoice, origin and other requested documents.

Put your first line into the RFQ builder.

Add the item, size, standard, material and quantity. The site prepares the request you can send.